Skip to content

Pilot target: around 4–10 January 2027 · All prices are drafts and exclude VAT · Screens on this page are samples, not real customer data

EV charging station management · OCPP 1.6J

Connect your charger once. Look after it every day.

Do you run chargers at a condo, hotel, shop or company car park? When the pilot opens around January 2027, AC or DC chargers from EV Easy, and other brands that support OCPP, will connect to our system with no per-station fee.

  • No per-station fee
  • Drivers scan a QR code, no app to install (phase P1)
  • Starting with OCPP 1.6J
Owner portal (sample)UI example, not live yet

What's in the system

Five parts, each labelled with when it arrives

To be upfront: no part is open to customers yet. We're taking names first, and every part is labelled with the phase it comes in.

The core that talks to your chargers

This part talks to chargers over OCPP so you can see their status, control them remotely and read the meters. So far it has passed local testing with OCPP 1.6J only; it isn't connected to any customer's charger yet.

Passed local testing Phase P1 / Jan 2027

Drivers scan a QR code and charge on the web

When the pilot opens, drivers won't need an app. Charging is free during the pilot and the price shown is 0 baht. PromptPay or card payment comes in a later phase, and we don't store card numbers in our system.

Free mode, phase P1 / Jan 2027 Payment on the same page, coming soon (phase P2)

Station owner portal

Our target is that you sign up yourself and connect a charger in about 5 minutes. It will have 4 tabs: Overview, Chargers, Revenue, and Customers & reviews.

Phase P1 / Jan 2027

EV Easy control room

Our team will use it to see every station and set who can do what. Thai-language fault codes and platform fee settings come with the payments phase.

Roles and station overview, coming soon (phase P1) Thai fault codes and fees, coming soon (phase P2)

Developer portal

If you have your own system and want to connect it, there will be API docs, webhooks and a simulated charger for testing. This comes after the payments system is done.

Coming soon (after phase P2)

What station owners run into

The station is open, but you still have to watch it

Three things this system is meant to make easier

  1. You have to go and look

    You don't know if a charger is free, charging or broken until you walk over or someone calls you.

  2. Drivers don't want another app

    Drivers just want to charge, but many places make them sign up for a new app first.

  3. Usage totals are manual work

    Energy used and the number of sessions have to be noted or added up by hand, charger by charger.

Six chargers, one on a pedestal and five on the wall, along a covered car park wall
An EV Easy charger installation

How it works

Five steps, from the waitlist to seeing every charger

You can't connect a charger yourself yet. These are the steps you'll follow once the pilot opens.

1

Join the waitlist

Tell us roughly how many charging points you have and which province you're in. We'll get back to you as the pilot gets close.

What the waitlist form asks

  • Name, email, provinceRequired
  • Number of charging points, AC/DCRequired
  • Phone, company or station nameOptional
Summary of the waitlist form questions
2

Connect your charger yourself

Point your OCPP charger at our system. Our target is about 5 minutes, and the system will tell you whether your charger can talk to us yet (phase P1 / Jan 2027).

Owner portal (sample)
Charger DEMO-01Connected
  • Charge Point IDDEMO-01
  • OCPP1.6J
  • Last heartbeat2 minutes ago
Sample screen, not real customer data
3

Set up your station

Charging is free during the pilot, and drivers see a price of 0 baht. Collecting payment from drivers and time-of-day pricing come in phase P2.

Owner portal (sample)

Station price

  • Pilot price0 baht (free mode)
  • Time-of-day pricingComing soon (phase P2)
Sample screen, not real customer data
4

Drivers scan a QR code

Drivers don't install an app. They scan the QR code and start or stop charging in their phone's browser (phase P1 / Jan 2027).

Charger A2 · Type 2Available
  • Scan
  • Plug in
  • Start

Pilot price0 baht (free mode)

Sample screen, not real customer data
5

See status and usage

The owner portal will have 4 tabs: Overview, Chargers, Revenue, and Customers & reviews. In phase P1 the Revenue tab shows energy used and the number of sessions, with amounts at 0 baht.

Owner portal (sample)

Chargers at this station

  • A1Available
  • A2Charging
  • B1Faulted
  • B2Offline
Sample screen, not real customer data

Who it's for

Places that already have chargers, or are about to

A technician laying cable for a wall charger in a covered ground-floor car park

Condos and housing estates

Let the building manager see shared chargers from one portal (phase P1).

A pedestal charger under a carport roof, with a blue-painted bay next to trees

Hotels and guesthouses

Guests scan a QR code and charge on their own, no app needed (phase P1).

Wall charger on the orange outside wall of a commercial building, next to a breaker box

Commercial buildings

A charger at the front of the building, with status and usage in the owner portal (phase P1).

Pedestal and wall chargers in front of yellow-marked parking bays

Company car parks

Manage several stations and give staff and technicians separate access (Pro plan, phase P1).

An EV Easy technician in a team shirt preparing cable for a charger installation

Buy and install your charger with EV Easy

Charging points installed by EV Easy use the Starter plan free for life (a policy in the draft pricing).

EV Easy chargers

EV Easy wall-mounted AC charger with a black and white front and a display
EV Easy wall-mounted AC charger
DC charger (photo coming)

Already have an OCPP charger?

When the pilot opens, other brands that support OCPP will connect with no per-station fee too.

  • Starting with OCPP 1.6J
  • OCPP 2.0.1 at connection level is planned for phase P1
  • No need to replace your charger if it supports OCPP

Pricing

Price per charging point (draft)

Billed per charging point per month. These numbers are still drafts, may change before launch, and exclude VAT.

No per-station fee

Once you can collect payment from drivers (phase P2), the platform fee per session starts at 0%.

Draft price / may change Excludes VAT

If you buy and install your charger with EV Easy, the points we install use the Starter plan free for life, and at first EV Easy covers the drivers' payment fees (driver payments arrive in phase P2).

Pro

Draft price / may change
AC
฿249 per AC point / month
DC
฿399 per DC point / month
Sign up for ProOpens Jan 2027
What's included
  • Everything in Starter
  • Up to 50 charging points (this number may change)
  • Manage several stations, with separate access for staff and technicians (phase P1)

Coming in phase P2: collecting payment from drivers and payouts to station owners

Business

Draft price / may change
AC
฿349 per AC point / month
DC
฿549 per DC point / month
Sign up for BusinessOpens Jan 2027
What's included
  • Everything in Pro
  • More charging points than that; we load-test before signing large contracts
  • Basic API, once the developer portal opens

Coming after phase P2: API docs, webhooks and a simulated charger for testing

This draft has no platform setup fee. You pay monthly and can cancel. Once payments from drivers are possible, the platform fee per session starts at 0%.

Charging points sold and installed by EV Easy use the Starter plan free for life. EV Easy covers the drivers' payment fees for the initial period only.

For now, no plan includes PromptPay or card payments, time-of-day pricing, or payouts to owners. All of these are in phase P2.

Open standard

What's ready and what isn't, plainly

Open standard: OCPP

We start with OCPP 1.6J. OCPP 2.0.1 at connection level is planned for phase P1; the rest follows in later phases.

Tested locally

The core has passed local testing with OCPP 1.6J, but it isn't connected to any customer's charger yet.

No card numbers stored

When payments open in phase P2, drivers pay through a payment provider. We don't store card numbers ourselves.

Personal data

We use waitlist details as set out in our privacy policy.

Questions station owners often ask

Can I sign up and start using it today?

Not yet. Right now we're taking names, and we're aiming to open the pilot around 4–10 January 2027.

Do I have to buy my charger from EV Easy?

No. When the pilot opens, AC or DC chargers bought from us and other brands that support OCPP will connect the same way. But if you buy a charger and have us install it, the points EV Easy installs use the Starter plan free for life.

Do drivers need to install an app?

No. When the pilot opens, drivers use a mobile web page: they scan the QR code and tap to start or stop charging.

When can I collect payment from drivers?

Payments are in phase P2, with a test mode starting from January 2027. Drivers pay by PromptPay or card through a payment provider; we don't store card numbers ourselves, and at first EV Easy covers the drivers' payment fees.

Why are the prices still drafts?

These numbers may change before launch, and they exclude VAT.

Which OCPP versions do you support?

We start with OCPP 1.6J. OCPP 2.0.1 at connection level is planned for phase P1, and the remaining functions follow in later phases. For now we don't guarantee that every 2.0.1 function works.

Where does my waitlist information go?

The waitlist button opens our sign-up form. How we use that information and what rights you have are set out in our privacy policy.

Leave your name and we'll get back to you

Joining the waitlist is free and doesn't sign you up for the service. As the pilot gets close, around 4–10 January 2027, we'll contact you to talk through the details.

The form asks for your name, email, province, number of charging points, whether your chargers are AC or DC, and whether you bought or installed them with EV Easy. Phone number and company or station name are optional. At the end there's a PDPA consent box to tick before you submit. The form itself is in Thai.

Join the waitlist

Please read our privacy policy before sending your details.